Polycom DOC2238A Bedienungsanleitung Seite 46

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 160
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 45
Chapter 2 - Hardware Installation
2-26
MGC+50 Hardware Installation
Unpacking and Positioning the MGC+50
To unpack and position the MGC+50:
1. When you receive your MGC+50, inspect the equipment for damage and
verify that the components match the packing slip. If you did not receive
a component or if there is damage to the system, notify Polycom
immediately.
Figure 2-12: MGC+50 package
2. Place the MGC+50 unit on a stable flat surface in a location that meets
the MGC+50’s environment requirements, which are:
Operating temperature: 10°–40°C (50°–104°F)
Humidity: 15%–90% noncondensing
Altitude: Up to 3,000m (10,000ft)
ESD: +8 kV
Carrying Strap
Seitenansicht 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 159 160

Kommentare zu diesen Handbüchern

Keine Kommentare